特级免费毛片-特级毛片在线观看-特级毛片在线-特级毛片永久久免费观看-特级毛片一级美国黑人-特级毛片网站

E-Mail: [email protected] | Hotline:0760-22601408
Home > News >>  News center
Automatic winding machine inspection before the operation
Date:2019-09-24 08:14:38 Click:
 

Frist, fully automatic winding machine, winding machine and auxiliary equipment inspection and maintenance

1. Inspection and maintenance of horizontal winding machine

1) Always check the lubrication of all moving parts, ensure good lubrication.

2) Always check all parts of fastening bolts loose to timely discovery tightened, especially tailstock foot bolts must be solid and reliable.

3) when the machine is rotated, the following operation is not allowed in the winding.

4) work, always check the disk, whether the top bend and fracture phenomena tailstock, identify problems and timely repairs.

5) when the machine is rotated, does not allow for commutation, speed shift and other operations.

2. Inspection and maintenance of vertical winding machine

1) Check the winding machine and winding butted whether faceplate bolts have been tightened, otherwise it must be re-tightened.

 2) Power Winder is damaged, such as insecurity, if it should be ruled out.

3) Check the telescopic retractable cover is good, and adjust the size of the opening and closing the distance to the faceplate or wound around the outer diameter of the winding 150ram, in order to ensure safe operation. Around

4) Check whether the strap winder or interfere with the operation of the tooling or other objects, or should be arranged in line reconnection position tray and other tooling objects.

The above content after check, can start winding machine winding operation.

SecondInspection and maintenance of winding clamping machine and the assembled rack.

1) Lift the system is working properly, if there is stuck, tilted fault stall or unsafe factors, should ask the professionals repair and eliminate insecurity.

2) the electrical part of the power and the shield is damaged, such as insecurity exists, if it should be excluded.

3) whether winding center clamping mechanism on the positive, otherwise the response is positive.

4) Whether the operator, starting compactors, the following person is not allowed to stand at compactor.

5) hydraulic compactor must check the pressure gauge is within the period of use, the reading is correct, whether hydraulic station is working properly, the hydraulic oil is adequate, or should be ruled out before use.


Automatic winding machine inspection before the operation

 

 

Previous:Lubrication Winder equipment

Next:Winder started when matters must be noted

主站蜘蛛池模板: 国产永久免费视频m3u8 | 四虎精品成人a在线观看 | 日本韩国无矿砖码 | 亚洲国产高清一区二区三区 | 男人免费视频 | 国产欧美日韩精品一区二区三区 | 国产午夜小视频 | 免费岛国| 亚洲成人99 | 亚洲国产精品综合欧美 | 亚洲狠狠综合久久 | 国产欧美日韩综合二区三区 | 2021国产精品视频一区 | 热久久免费视频 | 欧美ggg666| a级毛片毛片免费观看永久 a级黄色片免费 | 欧美美女被爆操 | 校园全肉高h湿一女多男 | 亚洲高清色图 | 天堂资源在线www中文 | 男人午夜视频在线观看 | 国产一区二区精品久 | 日本人护士免费xxxx视频 | 亚洲国产精品久久人人爱 | 天堂在线国产 | www.九九热 | 污翼鸟| 91sao国产在线观看 | 欧美jjvideo | 希岛爱理aⅴ在线中文字幕 午夜综合网 | 国产另类视频一区二区三区 | 国产亚洲自愉自愉 | 亚洲AV精品一区二区三区不卡 | 小早川怜子息梦精在线播放 | 亚洲人成伊人成综合网久久 | 色欲麻将| yellow字幕网在线zmzz91 | 麻豆在线观看 | 秋霞午夜伦午夜高清福利片 | 天天躁天天碰天天看 | 麻豆网 |