Specification for safe operation of CNC winding machine
Date:2019-12-17 08:47:37 Click:
 

In order to guide the use of the equipment to the correct operation of CNC winding machine, to prevent improper operation caused by the safety accident, so that the equipment to maintain good running state, and to develop the following rules:

One week inspection:

1, check the power supply internal connection wire is loose, wire insulation glue whether scratch or broken exposed copper core wire;

2, check whether the power supply voltage of CNC winding machine is 220V + 10V;

3, check the automatic upper and lower material cylinder SENSOR line and trachea whether or not broken or clip, indicating lamp state;

4, check the automatic upper and lower material protection cover is normal;

5, check whether the automatic upper and lower material expansion is normal;

6. Check the safety cover of the CNC winding machine to start the switch;

7, check the CNC winding machine to stop the switch function is normal, whether the emergency stop switch can be locked, indicating the state of light;

8, check the teaching box on the key functions are normal;

9, check whether the CNC winding machine tension device is normal;

10 checking whether the safety protection cover of the feeding area on the automatic feeding machine is normal.

Two, note:

1, the adjustment machine personnel must pass through the specialized training examination qualified, is familiar with the adjustment machine rule and the maintenance skill;

2, before the machine will teach the box to stop the switch to press the lock, press the rules of the machine operation;

3, hold down the button box to teach is not more than 1SEC at a time, to prevent a needle frame collision fixture;

4, fault repair must be the teaching box and the switch on the panel to stop switch on (Hong Dengliang);

Must confirm the guide needle frame at 90 degrees 5, boot before returning;

6, around the line staff must be the hair before the hair in the anti - static cap, not to reveal the forehead hair;

7, the seat on the designated line within the body, and the winding shaft distance 40cm minimum, may not be resting on the table;

8, when the winding hands to lift the work, when necessary, the hand can be placed in the middle of the material box position, hand can not be placed on the upper and lower cylinder up and down, before and after, flip the gap, to prevent the injury of the hand;

9, wear line must be a quick stop switch on the panel to open, after confirmation of the red light, it can be carried out in line operation;

10, clean the waste wire must be on the front of the emergency stop switch on the panel to confirm the red light, can be carried out;

11, automatic feeding must check whether the material feeding machine tool before operation, if there is a need to take the material before starting materials;

12, machine failure, the staff can not be allowed to handle, must be notified to the mechanic repair, and indicate the state of failure.

 

Specification for safe operation of CNC winding machine

 

Previous:Development of production technology of CNC winding machine

Next:The rational use and maintenance of CNC winding machine

主站蜘蛛池模板: 国产午夜免费 | 艹b小说 | 日本老妇人乱视频 | 农夫成人网 | 亚洲AV福利天堂一区二区三 | 四虎国产欧美成人影院 | 四虎黄色网址 | 亚洲国产精品嫩草影院久久 | 99视频久久精品久久 | 国产成人盗拍精品免费视频 | 久久婷婷五月综合色精品首页 | 97色| 极品美女写真菠萝蜜视频 | 欧美xbxbxbbxxbb精品 | 国产123区在线视频观看 | 精品午夜寂寞黄网站在线 | 亚洲福利在线观看 | 国产欧美精品一区二区三区–老狼 | 美妇在线 | 精品破处 | 免费在线观看成年人视频 | 青青久久精品国产免费看 | 五月色天在线视频综合观看 | 亚洲美色综合天天久久综合精品 | 毛片亚洲毛片亚洲毛片 | 欧美国产在线 | 小早川怜子亚洲综合中文字幕 | 色久网 | 99热热99 | 欧美日韩精品一区二区三区视频在线 | h玉足嫩脚嗯啊白丝 | 亚洲欧美精品一区天堂久久 | 男人天堂日韩 | 四虎网址在线 | 熟睡迷j系列小说 | 国产农村乱子伦精品视频 | 热久久亚洲 | 欧美日韩成人在线视频 | 国产精品最新 | 精品国产综合 | 精品综合在线 |